HZJY-20K 20kV Insulation Resistance Tester
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2025-05-03 22:11
- Browse the number:
0
Company Profile
- Beijing Huazheng Technology co.,LTD.
-
Contact:
hikoxi(Mr.)
-
Email:

-
Telephone:

-
Phone:

-
Area:
Beijing
-
Address:
801, No.3 Suzhou Street, Haidian District, Beijing
- Website: http://e2ee0f97.qhdzrhh.com/
By certification [File Integrity]
Product details
Instrument using
measured DAR:
Select more than 1 minute length measurement.
Select the appropriate voltage and start.
The instrument automatically record 15 s and 60 s resistance, and calculate the absorption than after 60 seconds.
Absorption ratio calculation method: DAR = R60 / R15;
measured PI :
Select more than 10 minute length measurement.
Select the appropriate voltage and start.
The instrument automatically record 15S, 60S and 600S resistance, and calculate the polarization index after 600 seconds.
Polarization index calculation method : PI= R600/R60;
test connection points for attention
1. Tested to confirm product safety grounding, try not charged.
2. Confirm the instrument E end (ground) have been grounded.
3. The use of G terminal (protection ring) (this machine is of low voltage side of the screen)
When measuring high insulation resistance, the sample should be in the position a conductor surface protection between the two measuring end ring, and the conductor protection ring is connected to the instrument with a test line G side, try to eliminate the measuring error caused by the surface leakage current, security testing is accurate.
link:https://www.beijing-huazheng.com/transformer-test-equipment/hzjy-20k-20000v-20kv-digital-insulation.html
measured DAR:
Select more than 1 minute length measurement.
Select the appropriate voltage and start.
The instrument automatically record 15 s and 60 s resistance, and calculate the absorption than after 60 seconds.
Absorption ratio calculation method: DAR = R60 / R15;
measured PI :
Select more than 10 minute length measurement.
Select the appropriate voltage and start.
The instrument automatically record 15S, 60S and 600S resistance, and calculate the polarization index after 600 seconds.
Polarization index calculation method : PI= R600/R60;
test connection points for attention
1. Tested to confirm product safety grounding, try not charged.
2. Confirm the instrument E end (ground) have been grounded.
3. The use of G terminal (protection ring) (this machine is of low voltage side of the screen)
When measuring high insulation resistance, the sample should be in the position a conductor surface protection between the two measuring end ring, and the conductor protection ring is connected to the instrument with a test line G side, try to eliminate the measuring error caused by the surface leakage current, security testing is accurate.
link:https://www.beijing-huazheng.com/transformer-test-equipment/hzjy-20k-20000v-20kv-digital-insulation.html
New Products
-
Clear Carpet Floor Protector Self Adhesive Carpet Protection Film Shield
price: Negotiable
-
Clear Carpet Floor Protection Film Clean Removal Self Adhesive Surface Shield
price: Negotiable
-
Blue Temporary Puncture Resistant Dust Proofing Transparent Carpet Protection Film Roll
price: Negotiable
-
Carpet Protection Self Adhesive Clear Film Heavy Duty 600mm*50m
price: Negotiable
-
Decorators Carpet Protector Plastic Film 24" x 200' Self-Adhesive Surface Protective Film
price: Negotiable
-
CD Series 43 Inductors
price: Negotiable










